Every vibe command exits with one of eight codes, so a wrapper script can act on the result:
bash
if vibe run "$(cat brief.md)"; then echo "done"; fi| Code | Name | Meaning | What to do |
|---|---|---|---|
0 | OK | Done. For vibe run: the plan and the code both cleared review, and every required verification gate passed. Any P1 carried under loop.p1Tolerance was fixed in a final round and is listed in OUTSTANDING.md. For vibe plan: the plan cleared critique. Nothing was implemented, and any P1 the plan was accepted with under loop.p1Tolerance is still open: the end-of-run summary names it, and it is carried into the implementation prompt rather than fixed. | For vibe run: read FOLLOW-UPS.md, then merge the run's branch. For vibe plan: read PLAN.md, then vibe resume <run-id> --implement or implement it yourself. |
1 | ERROR | An error: a bad flag, an invalid config, a crash. | Read the message. transcript.log in the run directory has the rest. |
2 | NEEDS_HUMAN | The run needs you. It stopped for a question, the planner still raising questions after loop.maxQuestionRounds rounds of answering its own, a stop gate, a round it could not settle, a turn you stopped, a turn that went quiet for too long, or a turn stopped mid-flight for crossing the token ceiling. | Answer NEEDS-INPUT.md, then vibe resume <run-id>. |
3 | NO_CONVERGENCE | Didn't converge: loop.maxPlanRounds, loop.maxReviewRounds or loop.maxVerifyRounds was reached, or the findings went in circles or stopped falling. | Read the last critique or review. Decide the disputed point yourself in NEEDS-INPUT.md, raise the cap, or change the brief. |
4 | BUDGET | A ceiling was reached: budget.maxTokens, budget.maxCostUsd or budget.planShare. | vibe resume <run-id> --max-tokens <n> if the work is worth more. |
5 | RATE_LIMITED | Rate limited: Claude's window, or Codex's window above budget.codexLimitPercent, and the run did not wait. | Resume once the window resets. |
6 | PREFLIGHT | A precondition failed. Usually before any work: an agent's environment is missing a tool in toolchain, vibe run was started outside a git repository, another run is already working in this checkout, or the run's worktree could not be made. It can also come after implementation, when the directory turns out unable to host a later phase: a verification gate's command could not be launched at all, or the review found no diff to read. | Fix the cause; vibe doctor checks the environment. A run that stopped here after it started can be resumed. vibe plan still works outside a repository. |
7 | UNVERIFIED | The run finished, but a required verification gate never ran because it had no command. The work, its artifacts and its commits are all there. | Set verify.command or verify.gates. |
Two of these are not failures. Exit 2 is how an ordinary long run pauses for you. Exit 7 means the work is done and reviewed, and only the evidence that it runs is missing.
A run that exits 2, 3, 4 or 5 can be resumed with vibe resume, and so can one that stopped with exit 6 after it had started, once the cause is fixed. See the CLI reference.